Search

Leave a Message

Thank you for your message. We will be in touch with you shortly.

A double-height living room with a linen sofa, limestone fireplace, and glass doors opening onto a hedged terrace.

The Highlands Plaza Never Got a Ribbon-Cutting. That's Why It Already Feels Finished.

September 24, 2026

When Palisades Village reopened on August 15, thousands of people showed up. Rick Caruso cut a ribbon, the mayor spoke, and the day got a name: 19 months, $100 million, one ceremony. If you live in the Highlands, you probably watched some of that on the news and then drove up Palisades Drive to get your coffee like you had for months already, because your shopping center never closed the way the Village did, and it never got a single day to call its comeback.

That absence is not a gap in the story. It is the story. The Highlands Plaza came back in pieces, on nobody's timeline but each tenant's own, and by the time Café Vida opens there in October, the center will have quietly finished a recovery that the rest of the Palisades is still building toward with press releases and grand openings.

Two Different Ways Back

Palisades Village needed one enormous decision. Caruso Group owns the whole property, so reopening meant one company committing over $100 million to strip buildings to the studs, replace insulation and ductwork, and choose a single date to let everyone back in at once. That is what a developer-financed recovery looks like: centralized, expensive, and dependent on one entity's balance sheet and timeline.

The Highlands Plaza had no equivalent. It is a collection of small, independently owned businesses, and each one had to solve its own version of the same problem: insurance gaps, construction costs, and no way to know when foot traffic would return. Nobody was going to write one check to fix the whole block. Every tenant that came back made that bet alone.

Palisades Village Highlands Plaza
Ownership Single developer (Caruso) Independent small businesses
Financing $100 million+ centralized renovation Individual owner financing, savings, and community fundraising
Reopening One date, one ceremony (August 15, 2026) Staggered over 18+ months, no single event
Occupancy at milestone 99% leased at reopening Built tenant by tenant, no published leasing figure

Neither model is better. They just produce different textures of daily life. A single reopening gives you a headline. A staggered one gives you a shopping center that, by the time you notice it's finished, has been finished for a while.

What Was Already Working Before Anyone Was Watching

Long before the Village had a reopening date, the Highlands Plaza had a working Starbucks. The location reopened with a redesigned interior, soft chairs, community tables, live plants, and a small team running it from 6:30 a.m. to 3 p.m. while corporate figured out longer hours based on what the neighborhood actually needed. Moku Sushi was open. So was Spruzzo Restaurant & Bar. So was the Highland Postal Center, which matters more than it sounds like it should when your regular post office is closed and you still need to ship something.

None of that made news the way the Village's countdown did. There was no marketing campaign built around a hardware store reopening or a sushi counter staying in business. It just happened, tenant by tenant, while the rest of the Palisades was still negotiating with insurance adjusters.

The Highlands had one structural advantage that made this easier: the office and retail building at 1515 Palisades Drive was spared by the fire entirely, which meant the plaza wasn't starting from a burned lot the way parts of Sunset Boulevard were. But a surviving building doesn't reopen itself. Somebody still had to decide to reopen inside it, and enough people did that decision quietly enough that it never became a headline.

The Dojo That Came Back on a Teenager's Grant

Gerry Blanck had been teaching karate in the Palisades for 43 years when the fire took his studio on Marquez Avenue. He was 71. For more than a year, he kept his program alive by driving to a borrowed dojo in Santa Monica, teaching three days a week on someone else's mats, subsidized in part by community donations just to keep the lights on somewhere.

The math to come home never worked on its own. Insurance gaps and tenant-improvement costs are the same obstacle every displaced business owner in this recovery has faced, and Blanck had no more leverage than anyone else. What changed it was three of his own students. Mason Cohen, who started training with Blanck at age four, launched a nonprofit called Build Back Pali with friends Dylan Fullmer and Jake Yoon, aimed at getting Palisades businesses home. Blanck was one of their first grants: $50,000, paid directly to his new landlord.

"I couldn't have moved back," Blanck said. "I couldn't have done it without them."

He held his grand reopening on June 1, 2026, at 542 Palisades Drive, inside the Highlands Plaza. There was no citywide ceremony. There was a karate studio with kids on the mats again, one of whom, ten-year-old Andrew Madok, had lost his own home, uniforms, belts, and trophies in the same fire and never missed a lesson.

What October Actually Completes

Café Vida spent 23 years anchoring the Palisades Village on Antioch Street before the fire destroyed the building and terminated the lease outright. What happens to that original site, the historic Business Block, is now out of the restaurant's hands entirely and tied up with the property owner's own rebuilding decisions. Café Vida's owners, Luis Castaneda, Marcelo Marolla, and Francisco Cornejo, didn't wait to find out.

Their Culver City and El Segundo locations kept the business solvent through the displacement, which gave them room to choose where to come back rather than simply take whatever became available first. They chose the Highlands Plaza: 548 Palisades Drive, in the space that had been K Bakery Eatery + Bakeshop, with a build-out that includes a new patio the owners describe as a defining feature of the space. They know it will draw less foot traffic than the old Antioch corridor did. They're coming back anyway, for the relationships built over two decades in this specific community rather than for the location's math.

When that door opens in October, it won't be completing a shopping center that was mostly empty. It will be filling one of the last open storefronts in a plaza that has been functionally whole for months.

What This Actually Changes If You're Up Here

For a Highlands resident, the practical shift is smaller than the story around it. You can already get coffee, sushi, dinner, a package shipped, and your kid into a karate class within the same parking lot. What October adds is breakfast, and specifically the breakfast you may have driven down the hill for before the fire.

A few things worth knowing before you assume the plaza is "done":

  1. Café Vida's Highlands space is smaller than its old Antioch footprint, so expect a tighter room even after the new patio opens.
  2. The plaza's recovery has been driven by individual leases and individual financing decisions, not a single master renovation, so future changes here will likely keep arriving the same way: one tenant at a time, without a countdown clock.
  3. The Palisadian-Post's own commercial real estate reporting has called the Highlands "much further along" than Downtown, Marquez, or the Sunset and PCH commercial areas, which matches what residents who've been driving past it all year already know.

The Palisades Village reopening will keep getting the attention, because a single date and a $100 million number make for an easy story. The Highlands Plaza's comeback doesn't compress into one headline, because it never happened on one day. It happened on June 1 for a karate studio, sometime in mid-2025 for a coffee shop nobody wrote a press release about, and it will happen again in October for a restaurant that spent two years finding its way back to people it already knew.

If you've been up here through all of it, none of this will surprise you. If you're trying to understand why the Highlands feels more settled than the rest of the recovery, this is why: nobody waited for a ribbon.

For more on how Pacific Palisades neighborhoods are finding their own pace through recovery, The Cilic Group tracks these shifts block by block. If you're weighing a move in or around the Palisades and want a read on how a specific street or plaza is actually doing right now, not just what the headlines say, request a confidential consultation.

Work With Us

At The Cilic Group, we blend our love for real estate with a commitment to community. Partner with us to achieve your real estate dreams and make a lasting difference together.